Products News
The first typhoon machine at Xinjiang Jimunai wind farm was connected to grid successfully
Modified Time:2013-10-28

On October 25th, the first typhoon machine at Xinjiang Jimunai wind farm was connected to grid successfully. This wind farm is the second wind farm that is built in Xinjiang and connected to grid.